Karnataka Slum Development Board

Projects in Bengaluru North, Devanahalli, Bhatkala, Bijapur, Belagavi

Applications263257 registered
Delivered00 on time
Ran late130median 32 months
Rejected or revoked4plus 2 withdrawn
Construction of 300 DU's at ByatrayanpuraBengaluru North · Registration rejected · registered — Construction of 315 Houses in DevanahalliDevanahalli · Application withdrawn · registered — Construction of 108 DU's at VijayapuraDevanahalli · Application withdrawn · registered — Construction of 313 @ BhtkalaBhatkala · Registration rejected · registered — Construction 1285 Houses at Vijayapura city PMAYBijapur · Registration rejected · registered — Construction of 1748 @ Belagavi SouthBelagavi · Under construction · registered May 2025 Due Oct 2026 Construction of 1035 @ RaybagRaibagh · Under construction · registered May 2025 Due Oct 2026 Construction of 300 DU's at ByatarayanpuraBengaluru North · Overdue · registered May 2025 Due Dec 2025 PMAY 1500 MahalakshmipuramBengaluru North · Overdue · registered May 2025 Due Dec 2025 Construction of 313 @ BhtkalaUttara Kannada · Under construction · registered May 2025 Due Oct 2026 PMAY1500 MAHALAKSHMI LAYOUTBengaluru North · Registration rejected · registered — Construction of 798 @ AthaniAthni · Under construction · registered May 2023 Due Oct 2026 PMAY HFA (U)Bijapur · Under construction · registered Jan 2023 Due Feb 2027 Construction of 455 Houses including infrastructuBadami · Under construction · registered Jan 2023 Due Jan 2027 PMAY HFAKustagi · Overdue · registered Jan 2023 Due Dec 2024 PMAY HFAGangavati · Overdue · registered Jan 2023 Due Dec 2024 PMAY-HFA@BALLARI_609Ballari · Under construction · registered Dec 2022 Due Dec 2026 PMAY-HFA 500 GOVINDARAJANAGARABengaluru South · Overdue · registered Dec 2022 Due Jan 2024 PMAY-HFA@Bidar-750Bidar · Under construction · registered Dec 2022 Due Dec 2026 PMAY 976 DHARWADHubballi · Under construction · registered Dec 2022 Due Dec 2028 PMAY HFAShirhatti · Overdue · registered Dec 2022 Due Apr 2024 PMAY(HFA) RANEBENNUR 887Ranebennur · Under construction · registered Dec 2022 Due Apr 2027 PMAY-HFA @BANKAPURA 454DUSShiggaon · Overdue · registered Dec 2022 Due Mar 2026 PMAY_HFA@JEWARGI-750Jivargi · Under construction · registered Dec 2022 Due Dec 2026 Construction of 868 Units at K R ConstituencyMYSORE · Overdue · registered Dec 2022 Due Dec 2024 PMAY-HFA @ HANAGAL 1000DUSHangal · Under construction · registered Dec 2022 Due Dec 2026 Construction of 1344 Units at K R ConstituencyMYSORE · Overdue · registered Dec 2022 Due Nov 2024 Construction of 205 DU's at K.R.Nagara TownKrishnarajanagara · Under construction · registered Dec 2022 Due Oct 2026 CONSTRUCTION OF 516(GF) INDIVIDUAL UNITSBengaluru South · Overdue · registered Jul 2022 Due Jul 2026 Construction of 500 Houses @ MahalingapurMudhol · Under construction · registered Jul 2022 Due Feb 2027 Ballari_551dusBallari · Overdue · registered May 2022 Due Jan 2026 Chitaguppa 545Chitaguppa · Overdue · registered May 2022 Due Mar 2026 Construction of 1350 @ Hubli-Dharwad cityDharwad · Under construction · registered May 2022 Due Oct 2026 Hveri_500 dus projectHaveri · Overdue · registered May 2022 Due Jan 2026 Hirekerur 250 houses projectHirekerur · Overdue · registered May 2022 Due Feb 2026 shiggav,savanur &Bankapura-350 dusShiggaon · Overdue · registered May 2022 Due Feb 2026 RANEBENNUR 250DUSRanebennur · Overdue · registered May 2022 Due Feb 2026 Construction of 793 DU'sBengaluru North · Under construction · registered Dec 2021 Due Nov 2028 Construction of 500 houses at Humanbad TownHumanabad · Under construction · registered Dec 2021 Due Dec 2026 Construction of 500 dus at Chikkamagalur TownChikkamagaluru · Under construction · registered Dec 2021 Due Dec 2026 Chitradurga City-292 DUS under PMAY(U)-HFAChitradurga · Under construction · registered Dec 2021 Due Oct 2026 Constrution of 429 housesRamanagara · Under construction · registered Dec 2021 Due Oct 2026 Kudligi_879dus@PMAY-HFAKudligi · Under construction · registered Dec 2021 Due Dec 2026 Construction of 200 at Kitturu Town under PMAY(U)Belagavi · Under construction · registered Nov 2021 Due Oct 2026 Holalkere Town - 206 dus under PMAY(U)-HFA.Holalkere · Under construction · registered Nov 2021 Due Oct 2026 Construction of 250 Houses at Bilagi TownBilagi · Under construction · registered Nov 2021 Due Oct 2026 Construction of 500 Houses at Bagalkote cityBagalkot · Under construction · registered Nov 2021 Due Oct 2026 Construction of 705 Houses at Bailhongal Town.Belagavi · Under construction · registered Nov 2021 Due Oct 2026 Construction of 1000 Dus in RajarajeshwarinagarBengaluru South · Under construction · registered Nov 2021 Due Oct 2026 Construction of 1000 Houses in T DasarahalliBengaluru North · Under construction · registered Nov 2021 Due Oct 2026 CONSTRUCTION OF 350 DU AT AUARD TOWNAurada · Under construction · registered Nov 2021 Due Oct 2026 CONSTRUCTION OF 500DUS AT KADUR TOWNKadur · Under construction · registered Nov 2021 Due Oct 2026 Construction of 300 Houses at Birur Town.Kadur · Under construction · registered Nov 2021 Due Oct 2026 HOSADURGA 700 DUS under PMAY(U)-HFA.Hosdurga · Under construction · registered Nov 2021 Due Oct 2026 HIRIYUR @ 988 DUS UNDER PMAY-HFAHiriyur · Under construction · registered Nov 2021 Due Oct 2026 Molakalmuru Town_500 dus under PMAY-HFAMolakalmuru · Under construction · registered Nov 2021 Due Oct 2026 Honnali Town - 351 DUS under PMAY(U)-HFA.Honnali · Under construction · registered Nov 2021 Due Oct 2026 Construction of 264 (G+2) Houses at Hubli cityHubballi · Under construction · registered Nov 2021 Due Oct 2026 Byadagi Town_500 DUs under PMAY(U)-HFA SchemeByadagi · Under construction · registered Nov 2021 Due Nov 2026 Ranebennur Town_288 DUs under PMAY(U)-HFARanebennur · Under construction · registered Nov 2021 Due Nov 2026 Shiggavi, Savanuru & Bankapura Town_696 @PMAY-HFAShiggaon · Under construction · registered Nov 2021 Due Nov 2026 Construction of 1314 Houses in Slums of Aland TowAlanda · Under construction · registered Nov 2021 Due Oct 2026 CONSTRUCTION OF 1482 DU AT KALABURGAI CITYKalaburagi · Under construction · registered Nov 2021 Due Oct 2026 CONSTRUCTION OF 737 DUS AT CHINCHOLI TOWNChinchouli · Under construction · registered Nov 2021 Due Oct 2026 CONSTRUCTION OF 1263DUS AT CHINCHOLI TOWNChinchouli · Under construction · registered Nov 2021 Due Oct 2026 CONSTRUCTION OF 1292 GF, 108 G+1 AT RAICHUR CITYRaichur · Overdue · registered Nov 2021 Due Oct 2021 Construction of 200 houses in Nelamangla TownNelamangala · Under construction · registered Oct 2021 Due Oct 2026 Construction of 240 (G+3) at BETTADASANPURABengaluru South · Under construction · registered Oct 2021 Due Oct 2026 Construction of 760 Dus in chikkaballapura TownChikkaballapur · Under construction · registered Oct 2021 Due Oct 2026 construction of 1000 dus at Hassan cityHassan · Under construction · registered Oct 2021 Due Oct 2026 CONSTRUCTION OF 1000DUS AT HOLENARASIPURA TOWNHolenarsipur · Under construction · registered Oct 2021 Due Oct 2026 Hospete town - 1230 DUS under PMAY(U)-HFA SchemeHospet · Under construction · registered Oct 2021 Due Oct 2026 Construction of 250 Houses at Nidagundi (BB) townNidagundi · Under construction · registered Oct 2021 Due Oct 2026 Construction of 474 Houses at Talikote Town.Talikota · Under construction · registered Oct 2021 Due Oct 2026 KARNATAKA SLUM DEVELOMENT BOARDShorapur · Under construction · registered Oct 2021 Due Oct 2026 CONSTRUCTION OF 200 HOUSED IN SHORAPUR TOWNShorapur · Under construction · registered Oct 2021 Due Oct 2026 CONSTRUCTION OF 200 HOUSES IN GURUMITKAL TOWNYadgir · Under construction · registered Oct 2021 Due Oct 2026 Construction of 275 Houses at Badami TownBadami · Under construction · registered Oct 2021 Due Oct 2026 Construction of 565 Houses at Rabakavi BanahattiBagalkot · Under construction · registered Oct 2021 Due Oct 2026 Construction of 250 Houses at Teradal Town.Bagalkot · Under construction · registered Oct 2021 Due Oct 2026 Construction of 455 Houses at Kerur TownBadami · Under construction · registered Oct 2021 Due Oct 2026 Construction of 250 Houses at Mudhol TownMudhol · Under construction · registered Oct 2021 Due Oct 2026 Construction of 250 Houses @ Hungund & Ilkal townHungundi · Under construction · registered Oct 2021 Due Oct 2026 Harapanahalli Town - 1156 DUS under PMAY(U)-HFABallari · Under construction · registered Oct 2021 Due Nov 2026 Kampli Town - 500 DUS under PMAY(U)-HFA.Kampli · Under construction · registered Oct 2021 Due Nov 2026 Siruguppa Town - 598 DUS under PMAY(U)-HFASiruguppa · Under construction · registered Oct 2021 Due Nov 2026 Sanduru town_651 DUS under PMAY(U)-HFA SchemeSanduru · Under construction · registered Oct 2021 Due Nov 2026 Construction of 588 Houses at Nippani TownBelagavi · Under construction · registered Oct 2021 Due Oct 2026 Construction of 905 Houses at Belagavi NorthBelagavi · Under construction · registered Oct 2021 Due Oct 2026 Construction of 469 @ KhanapuraBelagavi · Under construction · registered Oct 2021 Due Oct 2026 Construction of 873 at Kuduchi Town.Raibagh · Under construction · registered Oct 2021 Due Oct 2026 Construction of 983 houses at Savadatti TownBelagavi · Under construction · registered Oct 2021 Due Oct 2026 Construction of 400 @ SavadattiBelagavi · Under construction · registered Oct 2021 Due Oct 2026 Construction of 1429 houses at Mudalagi Town.Belagavi · Under construction · registered Oct 2021 Due Oct 2026 Construction of 518 houses at kuduchi (Harogeri)Raibagh · Under construction · registered Oct 2021 Due Oct 2026 Construction of 1430 Houses in CV Raman NagarBengaluru South · Under construction · registered Oct 2021 Due Oct 2026 Construction of 412 Housese in HebbalaBengaluru North · Under construction · registered Oct 2021 Due Oct 2026 Construction of 336 (G+3) houses at shanthinagarBengaluru South · Under construction · registered Oct 2021 Due Oct 2026 CONSTRUCTION OF 552 g+2 DUS IN BASAVAKALYANA TOWNBasavakalyana · Under construction · registered Oct 2021 Due Oct 2026 CONSTRUCTION OF 800 DUS IN BASAVAKALYANA TOWNBasavakalyana · Under construction · registered Oct 2021 Due Oct 2026 Construction of 612 houses in Shidlaghatta TownSidlaghatta · Under construction · registered Oct 2021 Due Nov 2026 Chitradurga City -1226 dus under PMAY(U)-HFA.Chitradurga · Under construction · registered Oct 2021 Due Oct 2026 CONSTUCTION OF 1002 DUS IN CHANNAGIRI TOWNChannagiri · Under construction · registered Oct 2021 Due Oct 2026 Davangere_895@PMAY-HFADavanagere · Under construction · registered Oct 2021 Due Oct 2026 JAGALURU_300@PMAY-HFAJaggaluru · Under construction · registered Oct 2021 Due Oct 2026 Davangere North - 828 DUS under PMAY(U)-HFADavanagere · Under construction · registered Oct 2021 Due Oct 2026 Construction of 300 Houses at Rona/GajendragadRona · Under construction · registered Oct 2021 Due Oct 2026 Construction of 500 Houses at NaragundNargund · Under construction · registered Oct 2021 Due Oct 2026 Construction of 863 Houses at Gadag CityGadag - Betigeri · Under construction · registered Oct 2021 Due Oct 2026 CONSTUCTION OF 1473 DUS IN SHAHABAD CITYChittapur · Under construction · registered Oct 2021 Due Oct 2026 CONSTRUCTION OF 467 DUS IN SEDAM TOWNSedam · Under construction · registered Oct 2021 Due Oct 2026 CONSTRUCTION OF 283 G+2 DUS AT SEDAM TOWNSedam · Under construction · registered Oct 2021 Due Oct 2026 Construction of 643 Houses at Yelaburga townYelbarga · Under construction · registered Oct 2021 Due Oct 2026 CONSTRUCTION OF 402 HOUSES AT KOPPALKoppal · Under construction · registered Oct 2021 Due Oct 2026 CONSTRUCTION OF 1370 DUS IN RAICHUR CITYRaichur · Under construction · registered Oct 2021 Due Oct 2026 Construction of 800 House in chikkanayakanahalliChikkanayakanahalli · Under construction · registered Oct 2021 Due Oct 2026 Construction of 520 houses in Koratagere TownKortagere · Under construction · registered Oct 2021 Due Oct 2026 Construction of 906 Houses at Mundagod townMundagodu · Under construction · registered Oct 2021 Due Oct 2026 Construction of 411 Houses at Kumta Town.Kumta · Under construction · registered Oct 2021 Due Oct 2026 Construction of 200 Houses at karwarAnkola · Under construction · registered Oct 2021 Due Oct 2026 Construction of 661 houses at Haliyal TownUttara Kannada · Under construction · registered Oct 2021 Due Oct 2026 Construction of 644 houses at Shirsi TownUttara Kannada · Under construction · registered Oct 2021 Due Oct 2026 Construction of 579 Houses at Yallapura TownUttara Kannada · Under construction · registered Oct 2021 Due Oct 2026 Kamalapura_446 Dus under PMAY-HFA(U)Hospet · Under construction · registered Oct 2021 Due Oct 2026 Huvinahadgali Town - 741 DUS under PMAY(U)-HFAHuvina hadagali · Under construction · registered Oct 2021 Due Nov 2026 Construction of 300 Houses at Muddebihal TownMuddebihal · Under construction · registered Oct 2021 Due Oct 2026 Construction of 250 Houses at Sindagi town.Sindagi · Under construction · registered Oct 2021 Due Oct 2026 Construction of 250 Houses at Indi town.Indi · Under construction · registered Oct 2021 Due Oct 2026 Construction of 423 Houses in Vijayappura & DevanDevanahalli · Under construction · registered Oct 2021 Due Oct 2026 Constrution of 500 Houses in BasvangudiBengaluru South · Under construction · registered Oct 2021 Due Oct 2026 Construction of 1200 (GF) HOUSES at BommanahalliBengaluru South · Under construction · registered Oct 2021 Due Oct 2026 Construction of 235 Houses at Kundagola TownKundagola · Under construction · registered Oct 2021 Due Oct 2026 Construction of 625 Houses @ HubliDharwad centralHubballi · Under construction · registered Oct 2021 Due Oct 2026 Construction of 250 Houses at KalaghatagiKalaghati · Under construction · registered Oct 2021 Due Oct 2026 construction 375 Dus at Navalgunda Town.Navalagunda · Under construction · registered Oct 2021 Due Oct 2026 PMAY-HFA(U)Gangavati · Overdue · registered Oct 2021 Due Nov 2025 Construction of 750 Dus at Davadurga TownDevadurga · Under construction · registered Oct 2021 Due Oct 2026 Construction of 250 dus at sindhanuru townSindhanur · Under construction · registered Oct 2021 Due Oct 2026 Construction of 888 (G+3) Dus atRamanagaraRamanagara · Overdue · registered Oct 2021 Due Oct 2024 Construction of 1450 Houses in Tumkur CityTumakuru · Under construction · registered Oct 2021 Due Oct 2027 Construction of 1200 houses in Tiptur CityTiptur · Under construction · registered Oct 2021 Due Oct 2026 Construction of 300 houses in gubbi TownGubbi · Under construction · registered Oct 2021 Due Oct 2026 Construction of 1176 Houses at Dandeli townHaliyala · Under construction · registered Oct 2021 Due Oct 2026 KOTTURU_411@PMAY-HFAH B Halli · Under construction · registered Oct 2021 Due Oct 2026 Construction of 1188 (GF) in Ballari CityBallari · Overdue · registered Jul 2021 Due Mar 2023 JAYANAGARA CHAMARAJAPETE CHIKKAPETE 931Bengaluru South · Overdue · registered Jul 2021 Due Jun 2024 construction of 588 multi storied G+3 unitsBengaluru North · Overdue · registered Jul 2021 Due Nov 2023 construction of 1500 houses in Bidar townBidar · Overdue · registered Jul 2021 Due Mar 2023 CONSTRUCTIN OF 210 DUS (GF) IN RONA TOWNRona · Overdue · registered Jul 2021 Due Jun 2023 PMAY-HFAGadag - Betigeri · Overdue · registered Jul 2021 Due Jun 2023 PMAY-HFALakshmeshwar · Overdue · registered Jul 2021 Due Jun 2023 Construction of 200(GF) DUs in T narasipura TownT.Narsipur · Overdue · registered Jul 2021 Due Dec 2023 CONSTRUCTIONS OF 300 DU'S IN PAVAGADA TOWNPavagada · Overdue · registered Jul 2021 Due Dec 2023 PMAY HFA (U)Basavan Bagevadi · Overdue · registered Jul 2021 Due Mar 2026 Construction of 500 GF Du's in SiddlaghattaSidlaghatta · Overdue · registered Apr 2021 Due Oct 2022 Construction of 500 (GF) DU's in kollegala townChamarajanagar · Overdue · registered Apr 2021 Due Feb 2024 Construction of 460 (GF)DUs in holenarasipuraHolenarsipur · Overdue · registered Apr 2021 Due Apr 2025 Construction of 1008 (G+2) Houses at Sira CitySira · Overdue · registered Apr 2021 Due Dec 2022 Construction of 500 DU'sDoddaballapura · Overdue · registered Mar 2021 Due May 2026 construction of 893 GF DU's in Bangalore cityBengaluru North · Overdue · registered Mar 2021 Due Dec 2022 Construction of 500 (GF)Dus in Chamarajnagar townChamarajanagar · Overdue · registered Mar 2021 Due May 2024 CONSTRUCTION OF 300 (GF) DU'S IN BANNUR TOWNT.Narsipur · Overdue · registered Mar 2021 Due Feb 2024 CONSTRUCTION OF 500 DU'S IN UDUPI CITYUdupi · Overdue · registered Mar 2021 Due Jan 2023 CONSTRUCTION OF 500 DUs IN MANGALORE CITYMangalore · Overdue · registered Mar 2021 Due May 2023 Construction of 1300(G+2) DUs in Hubli cityHubballi · Overdue · registered Mar 2021 Due Jul 2024 Construction of 1590 DU's in Shivamogga city.Shivamogga · Overdue · registered Mar 2021 Due Jan 2024 CONSTRUCTION OF 500 DU S IN BHADRAVATHI CITYBhadravathi · Overdue · registered Mar 2021 Due Jul 2023 Construction of 250 DU's in Soraba town.Sorba · Overdue · registered Mar 2021 Due Dec 2023 Construction of 250 DU's in Shiralakoppa town.Shikaripura · Overdue · registered Mar 2021 Due Dec 2023 Construction of 1588 DUs in SAGARA CitySagara · Overdue · registered Mar 2021 Due Jul 2022 Govindarajanagara 1845 housesBengaluru South · Overdue · registered Mar 2021 Due Oct 2024 Construction of 250 (GF) DusGundlupet · Overdue · registered Mar 2021 Due Feb 2023 construction of 250 (GF) houses at Maddur TownMandya · Overdue · registered Mar 2021 Due Dec 2023 Construction of 250(GF) Du's in nagamangala TownMandya · Overdue · registered Mar 2021 Due Dec 2023 construction of 825 G.F.DU's in N.R.ConstituencyMYSORE · Overdue · registered Mar 2021 Due Aug 2025 construction of 1329 Dus in mysoreMYSORE · Overdue · registered Mar 2021 Due Dec 2023 Construction of 500 D.U.'s in Hunsur TownHunsur · Overdue · registered Mar 2021 Due Feb 2024 Construction of 700 G.F. D.U's in N.R.ConstituenyMYSORE · Overdue · registered Mar 2021 Due Mar 2023 Construction of 242GF Du's in ChikkaballapuraChikkaballapur · Overdue · registered Mar 2021 Due Oct 2024 construction of 500(GF) housesMandya · Overdue · registered Mar 2021 Due Dec 2023 Construction of 655 GF DU's in MysoreMYSORE · Overdue · registered Mar 2021 Due Mar 2024 CONSTRUCTION OF 300 (GF) DU'S IN NANJANGUDUNanjanagud · Overdue · registered Mar 2021 Due Dec 2024 Construction of 759 DU's in Bangalore cityYelahanka · Overdue · registered Mar 2021 Due May 2025 Construction of 250 (GF) DUs under PMAY HFA (U)Mudhol · Overdue · registered Feb 2021 Due Aug 2025 Construction of 250 (GF) DUs at Rabkavi BanhattiJamkhandi · Overdue · registered Feb 2021 Due Aug 2025 CONSTRUCTION OF 250 (GF) DUS UNDER PMAY HFA (U)Ilkal · Overdue · registered Feb 2021 Due Oct 2025 Construction of 250 (GF) DUs Under PMAY HFA (U)Badami · Overdue · registered Feb 2021 Due Oct 2025 Construction of 500 (GF) DUs in Bilagi townBilagi · Overdue · registered Feb 2021 Due Feb 2026 Construction of 449 (GF) DUs at Chikkodi TownChikkodi · Overdue · registered Feb 2021 Due Feb 2025 Construction of 301(GF)DUs in Kudchi TownRaibagh · Overdue · registered Feb 2021 Due Dec 2023 Construction of 829 (GF) Dus in Belagavi CityBelagavi · Overdue · registered Feb 2021 Due Jan 2023 SHIVAJINAGAR 500 DUS BANGALOREBengaluru North · Under construction · registered Feb 2021 Due Sep 2027 Construction of 525 (G & G+3) DUs in Hubli city.Hubballi · Overdue · registered Feb 2021 Due Jan 2024 Construction of 500 DUs in Kalghatagi town.Kalaghati · Overdue · registered Feb 2021 Due Jan 2021 Construction of 500 (GF) DUs at ChannarayapatnaChannarayapattana · Overdue · registered Feb 2021 Due Apr 2025 Construction of 250(GF) Units at SakleshpuraSakaleshpur · Overdue · registered Feb 2021 Due Dec 2023 Construction of 486(GF) DUs at ArakalugudArakalagudu · Overdue · registered Feb 2021 Due May 2025 Construction of 500(GF) UNITSMandya · Overdue · registered Feb 2021 Due Dec 2023 Construction of 287GF dwelling units at DandeliHaliyala · Overdue · registered Feb 2021 Due Oct 2024 Construction of 1800 (GF) DUs in Vijayapura cityBijapur · Overdue · registered Feb 2021 Due Feb 2026 Construction of 346 DU's ByatrayanpuraBengaluru North · Overdue · registered Feb 2021 Due Mar 2026 GANDHINAGAR933Bengaluru North · Overdue · registered Feb 2021 Due Nov 2025 Construction of 485 DU'sBengaluru North · Overdue · registered Feb 2021 Due Jun 2026 construction of 457 houses at T DasarahalliBengaluru North · Overdue · registered Feb 2021 Due Dec 2022 GANDHINAGAR500Bengaluru North · Under construction · registered Feb 2021 Due Oct 2027 SARVAGNANAGAR762Bengaluru East · Overdue · registered Feb 2021 Due Sep 2022 CONSTRUCTION OF 860 GROUND FLOOR DWELLING UNITSBengaluru North · Overdue · registered Feb 2021 Due Aug 2024 PMAY-HFA (U)Mundagodu · Overdue · registered Feb 2021 Due Dec 2025 PMAY HFA (U)Indi · Overdue · registered Feb 2021 Due Aug 2025 PMAY HFA (U)Muddebihal · Overdue · registered Feb 2021 Due Nov 2025 PMAY-HFA(U)Shahpur · Overdue · registered Feb 2021 Due Dec 2023 construction of 400 houses @ JewargiJivargi · Overdue · registered Feb 2021 Due Feb 2023 PMAY-HFA (U)Devadurga · Under construction · registered Feb 2021 Due Dec 2027 PMAY HFA (U)Bagalkot · Overdue · registered Feb 2021 Due Jan 2026 Ballari 1613 Du'sBallari · Overdue · registered Feb 2021 Due Sep 2023 Kamalapura 491 Du'sHospet · Overdue · registered Feb 2021 Due Oct 2023 Tekkalakote 268 Du'sSiruguppa · Overdue · registered Feb 2021 Due Oct 2023 PMAY-HFA (U)Gokak · Overdue · registered Feb 2021 Due Jun 2026 PMAY-HFA( U)Ramdurgh · Under construction · registered Feb 2021 Due Jun 2027 Construction of 768 G+3 Houses at KR PuramBengaluru East · Overdue · registered Feb 2021 Due Dec 2024 SARVAGNANAGAR616Bengaluru North · Overdue · registered Feb 2021 Due Dec 2024 chikkapetechamrajpete1155Bengaluru North · Overdue · registered Feb 2021 Due Apr 2026 Chikkapete500Bengaluru North · Overdue · registered Feb 2021 Due Apr 2024 Shanthinagar350Bengaluru North · Overdue · registered Feb 2021 Due Jan 2026 Govindarajanagara and Vijayanagara 1607 housesBengaluru South · Overdue · registered Feb 2021 Due Dec 2024 VIJAYANAGARA 1378 HOUSESBengaluru South · Overdue · registered Feb 2021 Due Jun 2024 BANGALORE SOUTH AND BASAVANAGUDI 1699Bengaluru South · Overdue · registered Feb 2021 Due Feb 2024 CONSTRUCTION OF 250 (GF) HOUSESHumanabad · Overdue · registered Feb 2021 Due Feb 2024 construction of 400 houses @ Bhalki townBhalki · Overdue · registered Feb 2021 Due Feb 2023 Construction of 230 Ground Floor Dwelling units iChintamani · Overdue · registered Feb 2021 Due Sep 2022 CONSTRUCTION OF 280DU'SChikkamagaluru · Overdue · registered Feb 2021 Due Apr 2023 CONSTRUCTION OF 250 DU'STarikere · Overdue · registered Feb 2021 Due Apr 2025 CONSTRUCTION OF 404 DUSKadur · Overdue · registered Feb 2021 Due May 2024 Construction of 801GF DUs in Harihara townHarihara · Overdue · registered Feb 2021 Due May 2023 Construction of 327 (GF) Units including infrastHassan · Overdue · registered Feb 2021 Due Jun 2023 CONSTRUCTION OF 250 GF DUs IN HANGAL TOWNHangal · Overdue · registered Feb 2021 Due May 2023 CONSTRUCTION OF 250 GF DUs IN BYADAGI TOWNByadagi · Overdue · registered Feb 2021 Due May 2023 CONSTRUCTION OF 500 (GF) DU's HOUSESKalaburagi · Overdue · registered Feb 2021 Due Jan 2023 construction of 250 (GF) housesChinchouli · Overdue · registered Feb 2021 Due Jul 2023 CONSTRUCTION OF 1000 (GF+1) DU'sChittapur · Overdue · registered Feb 2021 Due Feb 2023 construction of 250 (GF) DU's houses 01 slumChittapur · Overdue · registered Feb 2021 Due Jan 2023 CONSTRUCTION OF 250 (GF) DU'S HOUSESAlanda · Overdue · registered Feb 2021 Due Sep 2023 Construction of 250 housesAfzalpur · Overdue · registered Feb 2021 Due Oct 2023 construction of 400 houses @ sedam townSedam · Overdue · registered Feb 2021 Due Mar 2023 Construction of 600 Houses at SrinivasapuraSrinivasapura · Overdue · registered Feb 2021 Due Nov 2023 Construction of 843 DU's at KGFKolar · Overdue · registered Feb 2021 Due Aug 2023 Construction of 500 DU's at MulabagiluMulabagilu · Overdue · registered Feb 2021 Due Jan 2024 PMAY-HFAKoppal · Overdue · registered Feb 2021 Due Jun 2023 PMAY-HFA(U)Raichur · Overdue · registered Feb 2021 Due Jun 2023 PMAY-HFA (U)Raichur · Overdue · registered Feb 2021 Due Dec 2023 PMAY-HFAManvi · Under construction · registered Feb 2021 Due Dec 2027 PMAY-HFA (U)Sindhanur · Under construction · registered Feb 2021 Due Dec 2027 Construction of 1530(GF) RamanagaraRamanagara · Overdue · registered Feb 2021 Due Sep 2024 Construction of 450 (G.F) Du's Including InfrastrMadhugiri · Overdue · registered Feb 2021 Due Dec 2023 Construction of 500 (G.F) Du's Including InfrastrKunigal · Overdue · registered Feb 2021 Due Oct 2024 Construction of 200 (G.F) Du's Including InfrastrTuruvekere · Overdue · registered Feb 2021 Due Dec 2023 Construction of 450 (G.F) Du's Including InfrastrSira · Overdue · registered Feb 2021 Due Dec 2023 Construction of 213GF DUs at Haliyal town.Haliyala · Overdue · registered Feb 2021 Due Aug 2024 PMAY HFA (U)Bijapur · Overdue · registered Feb 2021 Due Jul 2025 PMAY HFA (U)Bijapur · Overdue · registered Feb 2021 Due Jan 2025 Construction of 250 houses at yadgiri city.Yadgir · Under construction · registered Feb 2021 Due Dec 2027 PMAY-HFA (U)Shorapur · Under construction · registered Feb 2021 Due Dec 2027 PMAY-HFA (U)Yadgir · Overdue · registered Feb 2021 Due Dec 2023

Open any project for its IQ Score and how late this builder's other projects ran.

Grouped by the promoter name on RERA, ignoring words like “Pvt Ltd”. Group companies that file under other names appear separately. Lateness is measured from each project’s original date, not counting the Covid-19 extension.

Sign in with your mobile number

Your first full report is free. We'll text you a 6-digit code; no password needed.

Unlock the full report?

Buy a report pack

You've used your free report. Credits never expire. Pay by UPI, card or netbanking through Razorpay.